1213 M-Core Cartridge 3 Series: 4 Port Valve
Preparation:
|
Handle Removal: Using a 3/32" Hex Wrench, loosen the Handle Screw until you can remove the Handle. |
Slide the Sleeve off of the assembly. |
Parts Legend |
In 2024 the 1213 cartridge was changed, the white Installation Sleeve is no longer required. Parts 3 and 4 that were originally black are now off-white .
5 Valve Body |
4 Adapter with Check Valves |
3 Pressure Balancing Puck |
2 Cartridge |
1 Cartridge Nut |
Cartridge Removal and Valve Body Preparation |
Unthread and remove the Cartridge Nut (1). Pull the blue Cartridge (2) out |
Using Needle-Nose pliers, remove the Pressure Balancing Puck (3), O-ring and Adapter (4). |
Grease the Outer O-Ring and inside of Valve Body (5). Note: If you notice residue inside the Valve Body (5), see article, Valve Body Cleaning and Flushing. |
4 Port: Tub and Shower Valve - For 3 Port Shower Only Valve, Click Here |
|
|
To View Complete Installation Video: |
Click, M-CORE 1213 Cartridge Replacement.
For additional information on M-Core Shower products, visit Single Handle Shower: M-Core at Solutions.moen.com.
Still Not Finding What You're Looking For?
Contact Us or Call 1-800-BUY-MOEN
Non US? Moen Canada | Other International Sites